Introduction:

In the realm of plumbing, the choice of pipes is pivotal, but equally crucial is the precision with which they are installed. SBM Gold Pipe Systems, renowned for its excellence, demands an installation approach that aligns with their high standards. In this comprehensive guide, we unravel the step-by-step best practices for installing SBM Gold Pipe Systems, ensuring longevity, reliability, and optimal performance.

Step 1: Cutting the Pipe with Precision

The journey of a flawless SBM Gold installation begins with precise pipe cutting. Utilize ratchet cutters, wheel cutters, or a fine tooth saw. Exercise caution when cutting into previously installed SBM Gold, opting for methods that preserve the pipe’s integrity. In case of visible damage, cut back at least 2 inches beyond the affected area.

Step 2: Preparing Pipe and Fittings

(a) Burrs and Bevels: Prior to assembly, eliminate any burrs or filings, beveling the pipe end using a chamfering tool. If unavailable, a sharp knife or file serves the purpose, albeit less preferred.

(b) Fit Check: Ensure a snug fit between the pipe and fitting. The pipe should make contact with the socket wall between 1/3 to 2/3 of the way into the fitting socket. Discard any fitting if the pipe goes entirely into the fitting at this stage.

Step 3: Application of Solvent Cement

This crucial step demands precision. Apply a generous coat of solvent cement to the outside of the pipe end. Simultaneously, use the same applicator to apply a thin coat inside the fitting socket. Avoid excess cement accumulation, ensuring a seamless assembly.

Step 4: Assembling the Joint with Finesse

Immediately after solvent application, insert the SBM Gold pipe into the fitting, rotating it ¼ to ½ turn for even cement distribution. Align the fitting correctly and hold the assembly for about 10 seconds to allow the joint to set.

Step 5: Verification of Proper Installation

A visual inspection is paramount. A uniform bead of cement around the joint indicates a proper installation. If absent, it signals inadequate solvent application. In such cases, disassemble and remake the joint to ensure system integrity.

Do’s and Don’ts of SBM Gold Pipe System Installation:

  1. No Pre-Assembly without Solvent Cement: Avoid pre-assembling the plumbing system without solvent cement to prevent dry-fit failures.

  2. Proper Cement Coverage: Ensure sufficient solvent cement on the pipe and fitting. Inadequate amounts may result in gaps, while excess can soften the material.

  3. Visual Inspection: Always visually inspect joints for a continuous bead of solvent cement. This simple step ensures system integrity.

  4. Allow for Expansion and Contraction: Factor in the natural movement of the pipe caused by temperature changes. Do not restrict this movement with hangers or straps.

  5. Avoid Stress Points: Steer clear of placing hangers or straps that restrict the pipe’s natural movement due to expansion and contraction.

  6. Mindful Cutting: When cutting into the aged pipe, use a fine tooth saw or wheel cutter; avoid ratchet cutters on the aged pipe.

  7. Insulation in Freezing Areas: Never install plumbing pipes in uninsulated areas prone to freezing.

  8. Chemically Compatible Products: Only use ancillary building products chemically compatible with SBM Gold Pipe Systems.

Conclusion:

Mastering the installation of SBM Gold Pipe Systems is a journey towards plumbing excellence. By adhering to these best practices, one not only ensures the longevity and reliability of the system but also contributes to a seamless, environmentally conscious plumbing infrastructure. For expert guidance and to explore the full potential of SBM Gold Pipe Systems, contact SBM GOLD. Elevate your plumbing projects with precision, reliability, and the gold standard – SBM Gold Pipe Systems.